Rubis fully integrated HoseTower

JLA was awarded for the engineering, manufacturing and installation of a fully integrated hosetower including 2 x cranes, integrated gangway and 40 hose loading arms.

 

 

 

 

Specification

Capacity 40 x hybrid hose loading arms
accessories 2 x cranes, gangway, range detection
Do you know need more information about any of our products / services?